Canary Islands Government Tenders Rehabilitation of 108 Homes in Candelaria

The file also includes improvements for 80 properties in Adeje and 36 in El Rosario, with a total budget of 9 million euros.

El Gobierno de Canarias licita la rehabilitación de 108 viviendas en Candelaria

Gobierno de Canarias · 2026-11-24

The Canary Islands Government, through the Canary Institute of Housing (ICAVI), has initiated the contracting file for the energy rehabilitation of 108 protected homes in the Los Menceyes group in Candelaria, funded by Next Generation EU funds.

Key points

  • 108 homes in Candelaria, 80 in Adeje, and 36 in El Rosario
  • Total budget of 9,096,771.14 euros excluding IGIC
  • Funding from European Next Generation EU funds
The works are part of Programme 1 for neighbourhood-level rehabilitation assistance, aimed at promoting energy improvements in residential buildings and contributing to better living conditions for residents. This action constitutes lot 1 of a joint contracting file that also includes the rehabilitation of 80 homes in the Los Olivos group in Adeje and 36 others in the La Esperanza group in El Rosario. In total, work will be carried out on 224 public homes on the island of Tenerife.
The intervention takes place within the framework of the residential rehabilitation and social housing assistance programmes of the Recovery, Transformation and Resilience Plan. Among its objectives are reducing non-renewable primary energy consumption and improving the energy efficiency of the housing stock. The project includes sub-projects for low-voltage electrical installations, plumbing, thermal installations, and health and safety studies.
Based on information from the official source: Gobierno de Canarias — Obras publicas vivienda y movilidad (24/11/2026)