The works are part of Programme 1 for neighbourhood-level rehabilitation assistance, aimed at promoting energy improvements in residential buildings and contributing to better living conditions for residents. This action constitutes lot 1 of a joint contracting file that also includes the rehabilitation of 80 homes in the Los Olivos group in Adeje and 36 others in the La Esperanza group in El Rosario. In total, work will be carried out on 224 public homes on the island of Tenerife.
The intervention takes place within the framework of the residential rehabilitation and social housing assistance programmes of the Recovery, Transformation and Resilience Plan. Among its objectives are reducing non-renewable primary energy consumption and improving the energy efficiency of the housing stock. The project includes sub-projects for low-voltage electrical installations, plumbing, thermal installations, and health and safety studies.




